1000L stainless steel automated beer brewhouse mash tun for sale

The set of 1000L beer brewhouse system is custom-built to fit each brewer’s individual needs. Our staff works with you on everything from defining your optimal brewery layout, to designing the setup and size of your brewhouse and tanks. Most importantly, every brewhouse is built with 304 Stainless Steel and uses Siemens or ABB motors, so they are as durable and hard-working as you are. Further, every equipment goes through a comprehensive quality control inspection before it leaves our factory, where everything, including the inside of the piping, is inspected.


Description

1000L steam heated beer brewhouse with operation platform

 

Technical parameters of 1000L beer brewhouse:


  • Sanity stainless steel 304 material for beer brewhouse
  • Thickness of inner shell: 3.0mm;  outer shell: 2.0mm;  Steam jacket:1.5mm
  • Heating method of beer brewhouse: gas, steam, electric
  • Tempered glass top manhole for beer brewhouse
  • Design pressure of steam jacket: 3 bar
  • 4 pcs of heavy duty stainles steel legs with leveling footpads
  • Exteiror wort grant
  • Variable speed motors for raker system and blender system
  • Operation platform matchable with height of beer brewhouse tank
  • Side stainless steel door for discharging spent grain automatically
  • Back flushing system
  • Wort pumps with ABB motor
  • Siemens or SEW motors
  • Omron or Schneider electric elements
  • PLC control cabinet amounted on beer brewhouse
  • Including stainless steel connecting pipes, valves, gaskets, etc…
  • A hot water tank can be added for more batches

 

Detailed pictures of beer brewhouse:


 

Certificate for beer brewhouse:


Our beer brewhouse system is approved by CE ISO TUV authorities.

 

FAQ:


Q1:What’s the payment you prefer for beer brewhouse?

A:The most used payment method is T/T. But other payment methods are also acceptable

Q2:Do you have technical support for beer brewhouse after we purchase equipment?

A:We will dispatch our professional technicians to go to your factory and give the support to help you learn how to install and maintenance the beer brewhouse system or help you to fix the machine when it goes wrong.

Q3:Where is your factory?

A:Our factory is located in Dezhou City, Shandong province,China. We can pick you up at the airport whenever you want to visit the factory.

Q4:Where is the port of loading?

A:The port of loading is Qingdao.

Q5:How long does it take for installation of beer brewhouse?

A:It depends on the capacity and configuration of your beer brewhouse system, it generally takes about 10 days to 25 days.

Contact us