Description
Brewing a good batch of beer takes a lot of work – especially when being done for the masses.
Whether you’re starting from scratch and learning how to make beer for the first time, or moving your home-brewing masterpiece to a new craft brewery, opening a brewhouse of your own means that you’re going to need a lot of help.
What Equipment Is Needed to Open a Brewery?
- Malt mill
- Filtration system
- Brewhouse
- Heat exchanger
- Hydrometer or refractometer
- Pumps
- Valves
- Cellar equipment(Beer ferment/Brite tank)
- Dispensing equipment
- Kegs
- Packaging equipment
BREWERY EQUIPMENT AND TANKS FOR 10BBL BREWHOUSE SYSTEMS
Standard 2 Vessel configuration with HLT and Heat ex-changer and 20 BBL Hot Liquor Tank.
All piping(except piping for HLT to mash-tun)
Mash/Lauter tun, Kettle/Whirlpool,
Work platform with stairs and railing
3 sanitary pumps
Brewhouse plumbing, valves, sight-glass, heat exchanger, rakes, all vessels on steam systems jacketed
Motor, Gear box, Control Panel equipped with 4-5 VFD’s, Thermocouples, PID controllers, Relays, Transformers, Grist Hydrator.
Recommended steam generator size 100-200kg/h.
All pumps and rakes variable speed for superior fluid control.
10BBL BREWHOUSE SYSTEMS WITH HLT 10BBL OR 20BBL AVAILABLE
SPARGING FOR BREWING SYSTEMS
BREWHOUSE CONTROL PANEL
Specifications and Sizing
Work with our innovative engineers to create customized solutions that are perfect for you and your brewery. At DEGONG Company we work to meet all your needs and with our various shapes, sizes, and specifications we are confident that we will be able to make a high quality product that you will love.
If you want to have a detailed brewhouse quotation,please contact me today.