2 vessel 2000L brewery equipment for making excellent beer

Craft beer is more and more popular all over the world. And nothing brews delicious beer better than craft beer brewing equipment provided by us.

Whether it’s a brewpub, taproom microbrewery or large scale brewery, our 1-200 HL brewery equipment are what you need to share your passion with the world.


Description

Caft brewery equipment to brew quality beer

Craft beer is more and more popular all over the world. And nothing brews delicious beer better than craft beer brewing equipment provided by us.

Whether it’s a brewpub, taproom microbrewery or large scale brewery, our 1-200 HL brewery equipment are what you need to share your passion with the world.

 

2000L brewery equipment brewhouse system with plate heat exchanger

2-vesssel brewing system Basic Configuration:

Mash tun/lauter tun combined 20 HL

Kettle/whirlpool tun 20 HL

Hot Liquid Tank (HLT) 20 HL

Plate heat exchanger (HE) etc.

A 2-vessel brew house as the basic configuration incl. HLT, which can guarantee 3-4 brews per day.

 

A hot water tank is preparing the hot water in advance to make sure there is enough water for mashing in and sparging etc, which is very important for continuous brewing. HLT is also used for hot water storage after wort cooling.

Heat exchanger spec will be defined as the actual data from brewing, like wort/water inlet/outlet temperature etc. A  single stage wort cooler is configured, which will be using the ice water for wort cooling. The ice water is from Ice Liquid Tank (ILT) with tap water to be cooled by separate plate cooler via glycol liquid.

 

Brewery equipment features



20 HL Mash/lauter tun, 1 pcs 

Material: AISI 304

Outer size: 1600*2900 mm

Volume: 2000L effective volume, 2600L total volume

Tank thickness: inside 3mm, outer 2mm

Inner tank treatment: polished, roughness: 0.4um

dish top head, cone bottom

Insulation, thickness: 100mm

Manhole with sight glass, size: 450mm, with engraved logo

PT100 thermal well

Bottom mash outlet, , with hot water connection

1* 360degree rotating spray ball, with small cleaning balls for glass manway

4*Stainless steel legs, with adjustable leg bolt ,

Stack pipe to the roof of defined as exact request.

1*flow sensor switch at mash liquid outlet

 

20HL kettle/Whirlpool tank,  1 pc 

Material: AISI 304

Outer size: 1600*2900mm

Volume: 2000L effective volume, 2600L total volume

Tank thickness: inside 3mm, outer 2mm

Inner tank treatment: polished, roughness: 0.4um

Cone top head, flat bottom with square steel support

Top installed with pre masher

Insulation, thickness: 100mm

Manhole with sight glass, size: 450mm, with engraved logo

PT100 thermalwell

1*Rotating spray ball inside, with small spray ball for glass cleaning

AISI 304 stainless steel leg,4 pcs

Tangent wort inlet at cylinder part, wort flow speed: 3m/s

Draining outlet at the lowest position/central bottom

Two clear wort outlet (bottom and cylinder)

Tank bottom with slight slope for easy draining

Bottom wort outlet

Central bottom with spray nozzle for remove hops after whirlpool

Bottom outlet installed with flow sensor

With tank flushing device after emptying wort in tank.

 

Spent grain hatch with chute;agitator;sight glass on the brewery equipment

 

Adding the hops in the kettle brewery equipment

 

Artisanal 2000L brewery equipment fermenters

Fermentation tanks specific:

Material:Inside wall, SUS 304, 3mm Outside wall, SUS 304, 1.5mm Cooling jackets, SUS 304, 1.5mm Insulation, PU, 100mm

-Dome top with dry hop port

-Side/Top manway

-Cone bottom, 60 degree

-Cooling jackets on both cylinder and cone

-Inside 360 rotating CIP ball

-Thermowell,

-Temperature sensor, Model: PT100

-Pressure gauge

-Safety/vacuum valve

-Inside polishing 0.2-0.4

-Working pressure: 0.15Mpa

-Testing pressure: 0.3Mpa

-Wort piping and butterfly valves

-Drainage piping and butterfly valve

-3/4 legs with adjustable bolts

 

For brewery equipment fermenters:dish top head discharge;heavy duty legs

DEGONG BREWERY EQUIPMENT Warranty time: 

3 years for main tanks

1 year for auxiliary system

1 year for electric parts

  • We are taking care of all after service, if there is any problem within warranty time.
  • Warranty time starting from customers acceptance or successful testing brew.
  • The necessary maintaining jobs is guaranteed if customer needs any support from us. The customer takes care of the travel expenses.
  • The expansion work can be done, if customer need engineering support from us.
  • Right person from after sales department will be following up the project operation and take care of all the request.
Contact Alice today

Talk to us about your requirements and we will design a system to work for you and your company. wlcome to consult brewery to get a perfect quotation.