700l steam heating red copper 3-vessels brewhouse

The 700L brewhouse contains mash/lauter tun,boiling/whirlpool tun and hot water tun.And the heating method is by steam.It adopt automatic spent grain removable system.Beside that,the motor and pumps are controlled by VFD,most important,we adopt famous brand, the brand is ABB or Siemens

20 in stock


Description

                  700l steam heating red copper 3-vessels brewhouse

The 700L brewhouse contains mash/lauter tun,boiling/whirlpool tun and hot water tun.And the heating method is by steam.It adopt automatic spent grain removable system.Beside that,the motor and pumps are controlled by VFD,most important,we adopt famous brand, the brand is ABB or Siemens

700L brewhouse

700L Brewhouse

a.3-vessels:700L mash/lauter tank,700L boiling/whirlpool tank,700L hot water tank

b.steam heating method.

c.Inner thickness:3.0mm,outer thickness:2.0mm,jacket thickness:1.5mm

d.insulation:polyurethane,thickness:100mm

        e.Useful capacity:700L,total capacity:900L

f.Heavy duty false botton with pillar support system

g.Fully insulated vessel

h.SS CIP High-flow rotary spray ball with 360 degree of coverage

i.Interior light

j.Sparge ring assembly

k.Top mahway(tempered glass)

l.Side manway for spent grain out

m.Gap of the sieve is 0.7mm

        n.automatic spent grain removable system

                                                                                    700L brewhouse

 

Our factory

 

Our engineer go to Visit customer’s brewery and explore brewing technology

          We have obtained TUV ceritification,which is issued by Germany institution

Guarantees:

  1. All the materials touching with beer directly are all top quality food grade stainless steel
  2. We use the first class valves and manhole for our equipments
  3. All the materials I use is nonmagnetic.
  4. The thickness of the material exact fit in with what shown in our quotation sheet
  5. Most importantly,Our staff is always available for your needs and questions.

After-sale services:

  1. Within the warranty period, any malfunctions caused by the quality issues or material issue, Degong will be responsible to it.
  2. After delivering the equipments to our customers, Degong will arrange special worker to do the track service,because we set up the marketing department for specially dealing with the feedback of customers for providing the satisfied service. Once Degong gets the feedback from customers, we will do our best to deal with it for you.
  3. For the malfunctions beyond the warranty period, Degong will also be responsible to it, but the seller should take in charge of the expenses.
  4. Degong can dispatch technicians to install the equipments for you, but the seller should take charge of the expenses.

If you have interest to know more details,please get in touch wiht me freely.

Email:[email protected]

WhatsApp: +86 18363007358

Skype: auril3

 

 

Additional information

Weight 500 kg
Dimensions 1500 × 1500 × 3000 cm